Custom home building pad

Stripped topsoil, placed and compacted structural fill in lifts, and finished the pad to the builder's elevation with GPS control.

Excavator on a mound of fill dirt
Lot size
0.8 acres
Completed
Aug 2025
Duration
4 days
Client
Residential

The job

Stripped topsoil, placed and compacted structural fill in lifts, and finished the pad to the builder's elevation with GPS control.

Scope of work

Services: Building Pads, Excavation, Grading. Completed in 4 days. [DEMO] Replace with the real project write-up and photos.

Photos

Excavator on a mound of fill dirt
Excavator on a mound of fill dirt · 1 / 3

Services & equipment

Building PadsExcavationGradingExcavatorsDozersDump trucks & trailers

From the client

Our building pad was ready the day the builder needed it. Straight answers the whole way through.

Dave R. [DEMO]Milton, DE

Have a lot that needs work?

Call now · +1 302-563-8888