Custom home building pad
Stripped topsoil, placed and compacted structural fill in lifts, and finished the pad to the builder's elevation with GPS control.

- Town
- Milton, DE
- Lot size
- 0.8 acres
- Completed
- Aug 2025
- Duration
- 4 days
- Client
- Residential
The job
Stripped topsoil, placed and compacted structural fill in lifts, and finished the pad to the builder's elevation with GPS control.
Scope of work
Services: Building Pads, Excavation, Grading. Completed in 4 days. [DEMO] Replace with the real project write-up and photos.
Photos
Services & equipment
From the client
★★★★★
Our building pad was ready the day the builder needed it. Straight answers the whole way through.